S04.jpg
S04 - After installation, connections are made from the ORC to other system components: the heat storage tank, air cooling condensers, and the parabolic troughs.
S05.jpg
S05 - The team tests interconnections to other subsystems to verify that the system is ready to go.
S06.jpg
S06 - Troughs are cleaned to remove any dust that has stuck to them during the hot summer months.