Photo Galleries » Eckerd College I
E01.jpg
E01.jpg
E01 - Assembly of individual trough units.
E02.jpg
E02.jpg
E02 - Assembled trough units are carried outside
E03.jpg
E03.jpg
E03 - Eckerd students help pre-drill holes for mounting screws
E04.jpg
E04.jpg
E04 - Krinner ground screws, used instead of concrete to mount the troughs, are installed first
E05.jpg
E05.jpg
E05 - Plates mounted to the screws create an attachment point for trough supports
E06.jpg
E06.jpg
E06 - Eckerd students help assemble trough support structures
E07.jpg
E07.jpg
E07 - Bird's-eye view of site during support assembly
E08.jpg
E08.jpg
E08 - Students help lift trough units into place
E09.jpg
E09.jpg
E09 - Bird's-eye view of the site after first trough line is finished
E10.jpg
E10.jpg
E10 - Volunteer students are cheerful despite the rain!
E11.jpg
E11.jpg
E11 - STG President Matt Orosz speaks at the ground-breaking ceremony
E12.jpg
E12.jpg
E12 - STG President Matt Orosz with Eckerd College President Dr. Donald R. Eastman III
E13.jpg
E13.jpg
E13 - President Eastman speaks at the installation ground-breaking ceremony
E14.jpg
E14.jpg
E14 - Both lines of Sopogy troughs mounted despite the rain!